Annual Textile Fiber and Film Technical Conference1992 |
Common terms and phrases
actual additional alarm allows analysis applications breaker capacitor cause changes circuit CLOSED communications considerations consumption cooling correct cost demand determine devices drawings drive effective electrical energy engineer environment equipment example existing facility factor Figure fixed flow frequency function harmonic heat higher improvement increased induction industrial input installation less liability limited load losses lower maintenance manufacturers measured mechanical metering monitoring moonlighter motor negligence normal notch operating output overvoltage performance phase plant possible power distribution practice present problem production professional programming protection range reduced reduced voltage registration result savings specific speed standard starter starting switching torque tort transformer transients trending trip typically unit usually utility values variable voltage wire